Moisturizer ingredients and usage

In the past few decades, concrete mixing stations across the country have used water and mortar to lubricate pumps. With the advancement of science and technology and the development of the times, new materials adapted to the lubrication of pump truck pipelines have emerged. Due to insufficient product quality, Understand that many concrete mixing stations are waiting and watching, wondering whether this technology is reliable. Some concrete mixing stations understand or believe that the technology is innovating and are the first to use lubricants. If you don’t know the lubricant and haven’t used it yet, don’t wait and see if the lubricant is worth using.

The moisturizing agent ingredients are a polymer environmental material. The entire structure is connected by ions, which is a small red powder state. Let the water have a lubricating effect, with a little twisting ability, which can better ensure that the pump truck pipeline still has a lubricating effect after multiple uses. Lubricant without impurities will not leave any residue and will have no adverse effects such as corrosion on the pump truck pipelines. How to use lubricating agent The use of lubricating agent is very important. Many of our customers at Yuanda Materials took a few packages of samples to try out, but then there was no response. At first, we thought it was because they were not suitable for their concrete mixing plants. Later, during a follow-up visit, I learned that they were using the pump in the wrong way, the lubricant was not as effective as it should be, and the wrong use method was not as effective as water and mortar to lubricate the pump. How much lubricant should be used with how much water (since the formulas of different lubricant manufacturers will be different, please consult your own supplier for the formula). Mix well and then use it to moisten the pump truck pipes (pump truck pipes) How many packs of lubricant should be configured according to the length of the pump truck? You also need to consult your own supplier for this). Construction can begin after the pipelines are run smoothly. If you really don’t understand, please ask the supplier to provide on-site guidance on the operation. Generally speaking, it is good to moisturize before construction. There is no need to moisturize again during the day and there will be no congestion. Just try to moisturize first next time. From the above ingredients and usage description of the pipe moisturizer, we know that the pipe moisturizer is not only an environmentally friendly polymer material, but also relatively convenient to use. It avoids the cumbersome process of water and mortar to moisten the pipes, thus saving trouble, time and effort. Effect.

</p

This article is from the Internet, does not represent the position of Toluene diisocyanate reproduced please specify the source.https://www.chemhdi.com/archives/14851

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: sales@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
E-mail
Products
Search
zh_CNChinese