Construction convenience of catalyst ZF-20 in waterproofing projects of public facilities
Introduction
The waterproofing project of public facilities is an important link in ensuring the long-term use and safety of buildings. With the advancement of science and technology, new waterproof materials and technologies have emerged continuously. Among them, the catalyst ZF-20, as a highly efficient waterproof material, has gradually been widely used in public facilities waterproofing projects due to its excellent performance and construction convenience. This article will introduce in detail the product parameters, construction methods, advantages of catalyst ZF-20 and its application in public facilities waterproofing projects.
1. Product parameters of catalyst ZF-20
Catalytic ZF-20 is a polymer material with excellent waterproofing properties and construction convenience. The following are its main product parameters:
parameter name | parameter value |
---|---|
Appearance | Colorless transparent liquid |
Density | 1.05 g/cm³ |
Viscosity | 500-800 mPa·s |
Solid content | 40% |
pH value | 7.0-8.0 |
Storage temperature | 5-35℃ |
Construction temperature | 5-40℃ |
Currecting time | 24 hours (25℃) |
Tension Strength | ≥2.0 MPa |
Elongation of Break | ≥300% |
Water resistance | Long-term soaking has no change |
Weather resistance | Excellent |
Environmental | Non-toxic and harmless, comply with environmental protection standards |
2. Construction method of catalyst ZF-20
The construction method of catalyst ZF-20 is simple and easy to use, and is suitable for waterproofing projects in various public facilities. The following are the construction steps:
1. Baseline treatment
Before construction, the base layer must be treated to ensure that the base layer is flat, clean, and free of oil and loose matter. The specific steps are as follows:
- Cleaning the base layer: Use brooms, vacuum cleaners and other tools to clean up dust and debris on the surface of the base layer.
- Repair cracks: For cracks and holes on the surface of the base layer, use cement mortar or special repair materials for repair.
- Wet base layer: Before construction, wet the base layer with water, but no clear water must be available.
2. Apply primer
Basket is an important step in the construction of catalyst ZF-20, which can enhance the adhesion between the coating and the substrate. The specific steps are as follows:
- Stir primer: Stir the catalyst ZF-20 primer evenly.
- Brushing primer: Use a roller or brush to apply the primer evenly on the surface of the base layer to ensure no brushing and accumulation.
- Drying time: The drying time of the primer is generally 2-4 hours, and the specific time depends on the ambient temperature and humidity.
3. Apply the main coating
The main coating is the core part of the catalyst ZF-20 waterproofing project, which can form a continuous waterproofing film. The specific steps are as follows:
- Agitate the main coating: Stir the main coating of the catalyst ZF-20 evenly.
- Print the main coating: Use a roller or brush to evenly apply the main coating to the surface of the base layer to ensure no brush leakage and accumulation.
- Drying time: The main coating drying time is generally 24 hours, and the specific time depends on the ambient temperature and humidity.
4. Paint the brushed surface
Pret coating is the next step in the construction of the catalyst ZF-20, which can enhance the weather resistance and aesthetics of the coating. The specific steps are as follows:
- Stirring surface coating: Apply the catalyst ZF-20 surface and stir evenly.
- Brushing surface coating: Use a roller or brush to apply the surface evenly on the surface of the base layer to ensure no brush leakage and accumulation.
- Drying time: The surface coating drying time is generally 24 hours, and the specific time depends on the ambient temperature and humidity.
III. Construction advantages of catalyst ZF-20Stability
Catalytic ZF-20 has significant construction advantages in public facilities waterproofing projects, which are mainly reflected in the following aspects:
1. Easy to construct
The construction method of the catalyst ZF-20 is simple and easy to use, and no complicated equipment and tools are required. Ordinary workers can operate it after simple training. Its liquid form is easy to apply and spray, and can quickly form a continuous waterproof film.
2. Strong adaptability
Catalytic ZF-20 is suitable for various base materials, such as concrete, masonry, metal, etc., and can adapt to different construction environments and conditions. Its construction temperature range is wide and can be constructed normally in an environment of 5-40℃.
3. Short curing time
The curing time of catalyst ZF-20 is relatively short and can generally be completely cured within 24 hours, greatly shortening the construction cycle and improving construction efficiency.
4. Environmentally friendly and non-toxic
Catalytic ZF-20 is made of environmentally friendly materials, is non-toxic and harmless, meets environmental standards, and will not cause harm to construction workers and the environment.
5. Excellent waterproofing
Catalytic ZF-20 has excellent waterproof performance, can effectively prevent moisture penetration, has no changes in long-term soaking, and is highly weather-resistant, and is suitable for various harsh environments.
IV. Application of catalyst ZF-20 in waterproofing projects of public facilities
Catalytic ZF-20 has wide application prospects in public facilities waterproofing engineering. The following are examples of its application in different public facilities:
1. Underground parking lot
The underground parking lot is a key area for waterproofing projects in public facilities. The catalyst ZF-20 can effectively prevent groundwater penetration and ensure the parking lot is dry and safe. It is simple to construct and has strong adaptability, and can quickly form continuous waterproof films to improve construction efficiency.
2. Swimming pool
Swimming pool is an important area for waterproofing projects in public facilities. The catalyst ZF-20 can effectively prevent moisture penetration and ensure the long-term use and safety of the swimming pool. It is environmentally friendly and non-toxic, and will not pollute the water quality. It is suitable for waterproofing projects in various swimming pools.
3. Roof Garden
Roof garden is a special area of waterproofing projects in public facilities. The catalyst ZF-20 can effectively prevent moisture penetration and ensure long-term use and safety of roof gardens. It has strong weather resistance, can adapt to various harsh environments, and is suitable for waterproofing projects in various roof gardens.
4. Subway Station
The subway station is a key area for waterproofing projects in public facilities. The catalyst ZF-20 can effectively prevent groundwater penetration and ensure the dryness and safety of the subway station. It is simple to construct and has strong adaptability, and can quickly form continuous waterproof films to improve construction efficiency.
5. Sports Venue
Sports are an important area for waterproofing projects in public facilities. The catalyst ZF-20 can effectively prevent moisture penetration and ensure long-term use and safety of sports venues. It is environmentally friendly and non-toxic, and will not cause harm to athletes and spectators. It is suitable for waterproofing projects in various sports venues.
5. Precautions for the construction of catalyst ZF-20
Although the construction of the catalyst ZF-20 is simple, the following matters need to be paid attention to during the construction process to ensure the quality and effect of the construction:
1. Grassroots treatment
Basic treatment is an important step in the construction of catalyst ZF-20. It is necessary to ensure that the base layer is flat, clean, and free of oil and loose matter. For cracks and holes on the surface of the base layer, cement mortar or special repair materials must be repaired.
2. Construction environment
The construction temperature range of catalyst ZF-20 is 5-40℃, and construction should be avoided during construction in high, low or humid environments. During construction, the ventilation should be maintained to avoid bubbles generated during the drying process of the coating.
3. Brush evenly
The coating of the catalyst ZF-20 must be evenly ensures no leakage and accumulation. When applying, use a roller or a brush to avoid using spray equipment to avoid uneven coating.
4. Drying time
The drying time of the catalyst ZF-20 is generally 24 hours, and the specific time depends on the ambient temperature and humidity. People trampling and stacking of items should be avoided before the coating is completely dry.
5. Construction Safety
Although the catalyst ZF-20 is environmentally friendly and non-toxic, it still needs to pay attention to construction safety during construction. Protective gloves and masks should be worn during construction to avoid coatings from touching the skin and eyes. Tools and hands should be cleaned in time after construction.
VI. Construction case analysis of catalyst ZF-20
In order to better understand the application of catalyst ZF-20 in public facilities waterproofing engineering, the following are two specific construction case analysis:
Case 1: Waterproofing project of an underground parking lot
Project background
A underground parking lot is located in the city center, with a high groundwater level and has groundwater penetration problems all year round. In order to ensure the dryness and safety of the parking lot, it was decided to use the catalyst ZF-20 for waterproofing.
Construction steps
- Basic treatment: Clean up dust and debris on the surface of the base layer, repair cracks and holes, and moisten the base layer.
- Brush primer: Stir the catalyst ZF-20 primer evenly, apply evenly on the surface of the base layer using a roller, and dry for 2 hours.
- Coating the main coating: Use the catalyst ZF-20 The main coating is stirred evenly, apply evenly on the surface of the base layer using a roller, and dry for 24 hours.
- Print surface coating: Apply the catalyst ZF-20 surface evenly, apply it evenly on the surface of the base layer using a roller, and dry for 24 hours.
Construction effect
After the waterproofing treatment of catalyst ZF-20, the groundwater penetration problem of underground parking lots has been effectively solved, the parking lot remains dry and safe, and the construction effect is good.
Case 2: A roof garden waterproofing project
Project background
A roof garden is located on the top of a high-rise building and is exposed to wind and rain for many years, with moisture penetration problems. In order to ensure the long-term use and safety of the roof garden, it was decided to use the catalyst ZF-20 for waterproofing engineering.
Construction steps
- Basic treatment: Clean up dust and debris on the surface of the base layer, repair cracks and holes, and moisten the base layer.
- Brush primer: Stir the catalyst ZF-20 primer evenly, apply evenly on the surface of the base layer using a roller, and dry for 2 hours.
- Print the main coating: Stir the main coating of the catalyst ZF-20 evenly, apply evenly on the surface of the base layer using a roller, and dry for 24 hours.
- Print surface coating: Apply the catalyst ZF-20 surface evenly, apply it evenly on the surface of the base layer using a roller, and dry for 24 hours.
Construction effect
After the waterproofing treatment of catalyst ZF-20, the moisture penetration problem of roof gardens has been effectively solved, the roof garden remains dry and safe, and the construction effect is good.
7. Future development of catalyst ZF-20
With the advancement of science and technology and the enhancement of environmental awareness, the catalyst ZF-20 has broad application prospects in public facilities waterproofing projects. In the future, the catalyst ZF-20 will be further developed in the following aspects:
1. Performance improvement
By continuously improving the formulation and production process, the waterproof performance of the catalyst ZF-20 will be further improved and can adapt to harsh environments and conditions.
2. Construction technology improvement
With the continuous improvement of construction technology, the construction method of catalyst ZF-20 will be simpler and more efficient, which can further improve construction efficiency and quality.
3. Enhanced environmental performance
With the increase in environmental awareness, the environmental performance of catalyst ZF-20 will be further improved, which can better meet environmental standards and requirements.
4. Expand the scope of application
With the improvement of the performance of the catalyst ZF-20 and the improvement of construction technology, its application scope will be further expanded and can be applied to more public facilities waterproofing projects.
Conclusion
As an efficient waterproof material, the catalyst ZF-20 has been widely used in public facilities waterproofing projects due to its excellent performance and construction convenience. By introducing its product parameters, construction methods, advantages and application examples in detail, this paper demonstrates the importance and application prospects of catalyst ZF-20 in public facilities waterproofing projects. In the future, with the advancement of science and technology and the increase in environmental awareness, the catalyst ZF-20 will play a more important role in public facilities waterproofing projects.
Extended reading:https://www.bdmaee.net/fascat4350-catalyst-fascat-4350/
Extended reading:https://www.newtopchem.com/archives/44390
Extended reading:<a href="https://www.newtopchem.com/archives/44390
Extended reading:https://www.newtopchem.com/archives/943
Extended reading:https://www.newtopchem.com/archives/633
Extended reading:https://www.bdmaee.net/polyurethane-catalyst-pc5/
Extended reading:https://www.cyclohexylamine.net/main/
Extended reading:https://www.newtopchem.com/archives/40368
Extended reading:https://www.bdmaee.net/wp-content/uploads/2022/08/Polyurethane-rigid-foam-catalyst-CAS-15875-13-5-catalyst-PC41.pdf
Extended reading:https://www.newtopchem.com/archives/category/products/page/104
Extended reading:https://www.bdmaee.net/trimethyl-hydroxyethyl-ethylenediamine/