HDI Manufacturer | HDI Factory | High Quality HDI Products – chemhdi.com Knowledge How to use high-efficiency pump truck lubricant floor pump Nanjing Concrete Pump Runtong Manufacturer

How to use high-efficiency pump truck lubricant floor pump Nanjing Concrete Pump Runtong Manufacturer

Pour this product into the corresponding volume of water ten minutes before the construction site, stir for 60-120 seconds to fully dissolve, and wait for use when the solution becomes viscous and moist. . According to the type of concrete delivery equipment and the length of the delivery pump pipe, configure the solution and water volume according to the dosage.

1. When using a ground pump to pump concrete, pour the prepared lubricant solution into the hopper (if there is serious water leakage at the bottom of the hopper, it cannot be pumped) Repair, other containers need to be prepared), first open the positive pump and pressurize the pump, so that the lubricating agent solution enters the delivery pipe in front of the concrete, until all the lubricating agent is transported and discharged outside the construction site.

2. Prepare clean water, pour it into the bottom of the bucket, and transport it into the ground pump. Do not start construction until all the lubricating agent in the ground pump is discharged.

</p

This article is from the Internet, does not represent the position of Toluene diisocyanate reproduced please specify the source.https://www.chemhdi.com/archives/7230

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: sales@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
E-mail
Products
Search
zh_CNChinese