To prevent segregation of concrete during the pouring process, during the construction of reinforced concrete components, attention should be paid to the basics such as not adding water at will, mixing the concrete not to wait too long before entering the mold, and the height of the concrete entering the mold not to exceed 2.5 meters. Problem
The problem can be solved by using Anhui Yulong anti-segregation agent, and there is no need for round-trip transportation and scrapping. Concrete with excessive slump can be transported to the construction site for timely adjustment and processing to meet the construction performance of the project. And avoid the need of material breakage, while saving the cost of adding dry cement mortar and adjusting, and the operating efficiency is also guaranteed. The use effect is very ideal!