The only solution is to remedy it. If the concrete segregates, we must first control the slump of the concrete within a certain range, so that its slump can be reduced, and then Increase the mixing time of concrete. Generally speaking, the separated concrete can also be mixed in the next step, but this also depends on the condition of its separation. If the segregation situation is particularly serious, stirring can no longer be carried out and can only be discarded. If concrete segregates, its conveying properties will be reduced. To put it simply, the flowing function of concrete is reduced. Because segregation occurs, its own flow function will be weakened. As a result, there will be blockage during the conveying process of concrete. Basically it’s because the mixer is clogged, but this is also the case
<img src="/upfile/202304/2023041334528065.jpg"/